Completed Project Information

LAPSSET – Port Management houses complete and occupied

At LAPSSET on 04/10/2019. The Port Management houses ( flats) have been completed and occupied by the police. Also the External Auditor, Fredrick Kimani, appreciating the extent of phase I and phase II of the project including works carried out during the abortive Presidential Launch. The auditor was taken through the scope of the projects […]

Past Events

Visit at Kizingitini, Lamu

At Kizingitini in Lamu on 02/10/2019 inspecting the effects of the ongoing flooding caused by high tides. Kizingitini mixed Secondary school is threatened with being washed. Present during the inspection was the school principal Mr. Issa c Kanyo, area chief Mr. Luqman, Asst Chief Ahmed Mhudhar,Elder Yusuf Omar and SDoPW staff led by CES Eng. […]

Ongoing Projects Past Events

New Works PS inspects progress at Mama Ngina Waterfront Project

New Works PS, Major General(Retired) Dr. Gordon Kihalangwa, CBS inspects ongoing works at Mama Ngina Waterfront Project in Mombasa. This is his debut site inspection meeting, days after taking charge at the State Department of Public Works. He is accompanied by Chief Architect Arch. Silvester Muli and his technical assistant Evans Rioba. The park will […]

Past Events

PS Handing Over Ceremony at Works Building

Outgoing PS, State Department for Public Works Prof. Paul Maringa(left) and the incoming PS, Major General(Retired) Dr. Gordon Kihalangwa signing report documents during a handing/taking over ceremony today at the 12th-floor boardroom, Works Building. Prof. Maringa has moved to the State Department for Infrastructure. Dr. Kihalangwa moved from the Ministry of Defence.